A Dive Into One of Our Most Challenging Pool Projects

June 1, 2024

Welcome to what might just be Blue Haven’s most daring pool project yet so far in 2023 – the St Albans cliffside pool build. Think of it as our version of an action-packed thriller, but in the world of pool construction. Here, our team didn’t just face a challenge; they tackled a veritable vertical puzzle, one steep slope at a time. Imagine crafting a pool on a terrain that’s more ‘edge of your seat’ than ‘flat backyard’. That’s St Albans for you – a project where every day was an episode of ‘Mission: Possible’ for our crew.

So, buckle up and join us on this exhilarating ride as we recount the story of the St Albans project.

The Terrain Challenge: Gerry’s Cliffside Excavation Conquest

Gerry's Cliffside Excavation Conquest

Our journey in St Albans began with excavation, a critical step in any pool construction, made even more demanding by the steep, cliff-like terrain and the need to comply with local pool-building regulations. Leading this endeavour was Gerry, a seasoned excavator with over three decades of experience. Gerry’s expertise was pivotal in navigating the precarious slopes while adhering to these regulations. His strategic approach involved a thorough assessment of the land, identifying the safest and most effective starting points to avoid any potential landslides. This project was a blend of high-tech machinery and precision handwork.

Despite the challenges, Gerry’s confidence never wavered. “I’ve done harder and easier,” he remarked, a statement that speaks volumes about his proficiency and the level of complexity involved in this project. This phase of construction was not just about removing earth; it was about sculpting a foundation in harmony with the natural landscape, ensuring the future pool’s stability and safety.

Plumbing Perfection with Patrick: Making Every Drop Count

Plumbing Perfection with Patrick

In the world of pool construction, plumbing is often an unsung hero, yet its importance cannot be overstated. Our skilled plumber, Patrick, faced a myriad of challenges in St Albans. The project demanded more than just connecting pipes. Patrick had to consider factors like stormwater location and sewage systems, intricacies often underestimated by clients. His expertise was particularly crucial when dealing with the gas heater, where understanding the need for a 40mm pipe was essential to maintain the correct gas volume.

Patrick’s meticulous planning and execution meant that the plumbing aspect of this project, despite its complexity, was completed efficiently. His work is a prime example of how thorough understanding and attention to detail result in a pool that is not only aesthetically pleasing but also functionally sound.

Electrifying Solutions with Anthony: Powering the Impossible

Electrifying Solutions with Anthony Powering the Impossible

Bringing electricity to a rugged site like St Albans was a challenge deftly met by Anthony, our seasoned electrician. In projects of this magnitude, pre-planning is key, and Anthony’s experience was instrumental in overcoming the various electrical hurdles. He stresses the importance of having experienced professionals on-site, a factor that often makes the difference between success and failure.

Anthony’s approach to the electrical setup was thorough and methodical, ensuring that all requirements were met efficiently and safely. His ability to adapt and solve problems on the go was crucial in a terrain as unpredictable as St Albans. The electrical work, often a complex aspect in pool builds, was completed seamlessly under his watch.

Designing Dreams with Richie

Designing Dreams with Richie

At the heart of this project’s success was Richie, the General Manager and the visionary leader of the St Albans project. With over 38 years of construction experience, Richie’s approach to this complex build was nothing short of extraordinary. For those who want to delve deeper into the pool design process, Richie incorporated these insider tips on pool design from the Blue Crew, which greatly enhanced the project’s execution. He employed a 3-stage pyramid approach to design, prioritising complexity, stability, budget considerations, and the unique challenges posed by the site’s elevation and location.

Richie’s ability to immerse himself in the design process, while keeping a keen eye on the practical aspects of construction, resulted in a pool that is not only visually stunning but also structurally sound. His leadership ensured that every team member, from the excavators to the electricians, worked in perfect harmony, a synergy that is evident in the near completion of this extraordinary project.

Stay tuned for the grand unveiling of this marvel, a true testament to what can be achieved when passion meets expertise. At Blue Haven, we believe in turning challenges into opportunities, crafting not just pools, but lifelong memories.