Blue Haven Pools

Waste Management Removal


Authorisation to book waste management:

WASTE MANAGEMENT CONTRACTOR REQUEST:

• Customer request for contractor to remove Excavated Material* from Pool Site to closest waste management plant.
*Non contaminated soil or clay but excluding rock, shale, acid sulphate affected or foreign matter.
• Customer to have payment PRIOR TO LOADING based on supervisor estimate.
• Long Haul float $300 plus $350 per hour, plus tolls and levy fees. Minimum 3-hour turnaround.
• Size of waste truck subject to street access, stockpile room and time span of pool excavation.
• Cost averages for large long haul cartage $1300 per truck and trailer
• Small long haul cartage $700 per bogie load
• Vegetation such as Builder’s rubble, bricks, concrete, tree roots, grass, must be sorted separately or sorted at the disposal plant.
• Tip fees payable by Customer.
• In the event of stock piling or direction of relevant authority bodies; silt barriers or any other erosion or pollution control measure payable by Customer.
• Traffic control not included if needed.
• Any allowance in Building Contract subject to type of soil (clean virgin soil, rock, contaminated soil), truck and trailer accessability.

NOTE: If you can't view the entire e-signature box below, please switch your mobile to landscape view.

AUTHORISED / SIGNED BY CUSTOMER:

 

Leave this empty:

Signature arrow sign here


Signature Certificate
Document name: Waste Management Removal
lock iconUnique Document ID: cd34d5e919e120d324cfceadf9212cdbf95fca24
Timestamp Audit
May 6, 2022 8:38 pm AESTWaste Management Removal Uploaded by Remonda Rose - gia@elitedigitalcampaigns.com.au IP 119.93.206.120